Source of solutions.

A large treatment plant with five parallel adsorbers for the removal of arsenic from groundwater. The systems operates reliably since 2003, using a total mass of 80,000 kg GEH 102.

Flow rate: 925 m3/h at a usage of 5,000,000 m3/year